Monday, July 25, 2011

An update on our new hospital!



poking our heads and tools out of the
luxury boarding suites.
 
the walls are taking place













Last week a few of us laced up our pink construction boots and headed over the the construction site of our new hospital located at 66 Caplan Ave. We chatted with the site supervisor, where he gave us a tour and showed us where rooms will be built. He (George) made it easy to understand the layout once explained. As of today July 25th, the walls were created so rooms are now easily seen. We have taken a montage of photos to show everyone the progress. The exam rooms look bright with large windows and much more spacious. Each kennel run and each luxury boarding room has its own window. There are now two surgical suites instead of just one with windows to allow natural light into  the surgery rooms. We proudly present some photos ( some are funny goofy as well!) of the progress. We hope to see everyone at our open house in the fall. Date to be determined based on the progress of the building.


having some fun on the constuction site


having a tour from the supervisor George
Kim waving from the laboratory area

No comments:

Post a Comment